[1]
Haryanto, S.S. et al. 2025. Analysis Of Box And Bored Pile Segment Planning In Tunnel Using Jacking Box Tunnel Method. Jurnal Ilmiah Dinamika Rekayasa. 21, 1 (Feb. 2025), 59–69. DOI:https://doi.org/10.20884/1.jidr.2025.21.1.8.